Huishan District, Wuxi City
2023-12-16
Diameter/Material/Year
DN000/Steel Pipe / 2000 Year
Check length
90 meters
Key Findings
Corrosion at 14; severe corrosion in the 0-60m section
Detection Suggestions:

Severe corrosion in the front section; high urgency for repair.

Project Overview

The pipeline has been in service for a long time. Severe corrosion was found in the 0-60m section, with a total of 14 corrosion points detected. The loss in cross-sectional area for water flow does not exceed 10%. Immediate repair is required.

Real Photos

Case 3 Image 1

Diagram of Detection Location

Case 3 Image 2

Sediment thickness shall not exceed 10% of the pipe diameter.

Case 3 Image 3

Moderate corrosion – surface spalling and pitting on the pipe wall

Case 3 Image 4

Cross-sectional area loss shall not exceed 10%