Liwan District, Guangzhou City
2024-03-19
Diameter/Material/Year
DN200/Steel Pipe/2020
Check length
102 meters
Key Findings
Sedimentation at 2 locations; internal anti-corrosion coating detachment at 1 locations
Detection Suggestions:

Repair plan required; maintenance should be scheduled.

Project Overview

Inspection detected sediment thickness not exceeding 10% of the pipe diameter. The anti-corrosion coating shows minor detachment but no exposure of the pipe material. A repair plan and maintenance schedule are recommended.

Real Photos

Case 4 Image 1

Diagram of Detection Location

Case 4 Image 2

Sediment thickness shall not exceed 10% of the pipe diameter.

Case 4 Image 3

Minor coating detachment on pipeline